UNOPS origins trace back to 1973, and until 1994 the Office for Project Services was part of the UN Development Programme. By decision of the UN General Assembly, UNOPS became a separate, self-financing entity within the UN development system on 1 January 1995. The UNOPS Peace and Security Cluster (PSC) is a principal service provider in the field of mine action with the United Nations Mine Action Service (UNMAS), UNDP, UNICEF, Governments of mine-affected countries and other mine action partners. It is led by the Director, who has overall authority and accountability for the performance PSC on behalf of its clients. The Director is responsible for administering and providing oversight of the day-to-day management of the Project Field offices, both according to the client requirements and in line with UNOPS rules and regulations.
With more than 20 years of experience in the country, UNOPS Afghanistan focuses on providing maximum support to the people of Afghanistan through the delivery of projects and services that improve the lives of people in need. The UNOPS Afghanistan Country Office (AFCO) serves as an organizational mechanism to deliver a range of projects for which UNOPS has been designated as the implementation agency. At present, UNOPS AFCO activities cover a range of sectors including humanitarian, basic human needs, cash for work, infrastructure, development, procurement and HR services.
The functional objective of UNOPS AFCO is to contribute to improving the lives of girls, boys, men and women living in Afghanistan. The aim of UNOPS AFCO is to provide efficient and cost-effective implementation services on behalf of all our partners to support the humanitarian response and development of the country. UNOPS AFCO’s mission is to exceed the expectations of all stakeholders in the delivery of AFCO services, at all times, in all places, in all circumstances, in order to improve the lives of Afghans in need.
Background Information - Job-specific
Project Information
The Water Emergency Relief Project (WERP) was established in response to the significant, ongoing drought exacerbating water access issues which has created an emergency situation in rural areas across southern and central Afghanistan. WERP will finance the provision of off-grid solar systems to support surface water irrigation in selected districts throughout Afghanistan. The UNOPS-managed WERP project primarily addresses water scarcity challenges faced by farmers in drought-affected districts by providing them with access to solar PV powered water driven pumps. These solar pumping systems will enable water to be drawn from rivers to irrigate agricultural land.
The project will pilot the Energy as a Service model (EaaS) by contracting Private Energy Service Companies (PESCs) to carry out the provision of services. These include the construction, installation, operation and maintenance of the solar PV powered irrigation pumps, pipelines; associated equipment and services. The intention is for the project to provide 80% of the capital costs (solar PV and water supply systems equipment) with the PESCs contributing 20% (Civil works, including pipeline materials). The project will pay for the operation and maintenance costs either fully or partially until the end of the two year project. The estimated completion date is mid 2025.
The UNOPS Jobs in Kabul, (Senior River Engineer) will have responsibilities that include:
The project will only consider rivers that are perennial, not seasonal. One of the project focus areas is to adopt appropriate technology for the instructure elements that make up the water supply and solar PV systems. The estimated quantity of water that is to be pumped from the river abstraction sites ranges from 10 to 250 m3/hr with the majority of the pump stations using the smaller pumps. The intention is to not to construct weirs or large pump stations that are appropriate for large irrigation schemes or municipal water supply systems. The proposed intake structures are small in terms of size and of low complexity, suitable for rural irrigation schemes.
Job-Specific Information
The Senior River Engineer shall work under the direct supervision of the Senior Project Manager and support project team members on the concept design of river engineering elements. The Senior River Engineer will provide technical input to irrigation water supply river abstraction structures, including site selection; flood hydrology; hydraulic design and general advice on river engineering and hydrology matters.
Specific responsibilities and duties include but are not limited to:
Education/Experience/Language requirements
a. Education
b. Professional Registration
c. Work Experience
Essential
Desirable
d. Language Requirements:
Please click on the below link for actual vacancy announcement to see the complete details and submission guideline as this is only an attempt for attracting female applicants for gender parity in organization. Please make sure you fill your profile/application properly with all relevant details in order to be considered for the next stage of recruitment/selection.
Afghanistan
Kabul